File #: 24-0665   
Type: Contract Status: Agenda Ready
In control: City Council
On agenda: 7/1/2024
Title: Reconstruction of Anzio Ramp at Falcon Field Airport Project (District 5) This project includes full reconstruction of the pavement of the Anzio Ramp at Falcon Field Airport. The Anzio Ramp was originally constructed in 1992 and provides airport access to adjacent hangars. An analysis of the pavement condition indicated that routine maintenance is no longer a sufficient solution to protect the current pavement and extend its longevity. Design investigation determined that full reconstruction of the pavement section is necessary. Staff recommends awarding a contract to the lowest responsible bidder, NEVE LLC, in the amount of $362,729.00, and authorize a change order allowance in the amount of $36,272.90 (10%) for a total authorized amount of $399,001.90. This project is funded by the Arizona Department of Transportation (ADOT) Grant and Falcon Field Airport.
Attachments: 1. Council Report, 2. Exhibit A - Project Site Map
Date Action ByActionResultAction DetailsMeeting Details
No records to display.

Title

Reconstruction of Anzio Ramp at Falcon Field Airport Project (District 5)

 

This project includes full reconstruction of the pavement of the Anzio Ramp at Falcon Field Airport. The Anzio Ramp was originally constructed in 1992 and provides airport access to adjacent hangars. An analysis of the pavement condition indicated that routine maintenance is no longer a sufficient solution to protect the current pavement and extend its longevity. Design investigation determined that full reconstruction of the pavement section is necessary.

 

Staff recommends awarding a contract to the lowest responsible bidder, NEVE LLC, in the amount of $362,729.00, and authorize a change order allowance in the amount of $36,272.90 (10%) for a total authorized amount of $399,001.90. This project is funded by the Arizona Department of Transportation (ADOT) Grant and Falcon Field Airport.