File #: 26-0131   
Type: Contract Status: Agenda Ready
In control: City Council
On agenda: 2/9/2026
Title: Arizona Farms Road High Pressure Gas Line Replacement Design-Bid-Build Contract. (Pinal County) This project includes replacement of existing 4-inch diameter high-pressure natural gas line within the Magma gas system located in Pinal County. The proposed project will replace approximately 26,000 linear feet (4.9 miles) of 4-inch high-pressure steel gas line with a 12-inch diameter high-pressure steel gas line to support system redundancy, and the continuing growth in the region. Staff recommend awarding a contract to Arizona Pipeline Company, in the amount of $5,598,357.15, and authorizing a change order allowance in the amount of $559,835.72 (10%), for a total authorized amount of $6,158,192.87. This project is funded by Utility Systems Revenue Obligations.
Attachments: 1. Council Report, 2. Council Map
Date Action ByActionResultAction DetailsMeeting Details
No records to display.

Title

Arizona Farms Road High Pressure Gas Line Replacement Design-Bid-Build Contract. (Pinal County)

 

This project includes replacement of existing 4-inch diameter high-pressure natural gas line within the Magma gas system located in Pinal County. The proposed project will replace approximately 26,000 linear feet (4.9 miles) of 4-inch high-pressure steel gas line with a 12-inch diameter high-pressure steel gas line to support system redundancy, and the continuing growth in the region.

 

Staff recommend awarding a contract to Arizona Pipeline Company, in the amount of $5,598,357.15, and authorizing a change order allowance in the amount of $559,835.72 (10%), for a total authorized amount of $6,158,192.87. This project is funded by Utility Systems Revenue Obligations.