File #: DSN 24017   
Type: DSN Action Status: Agenda Ready
In control: Design Review Board
On agenda: 3/12/2024
Title: DRB23-00745 - "Central Mesa Reuse Pipeline" (District 1). Within the 3600 block of East Thomas Road (north side) and within the 3600 block of North Val Vista Drive (east side). Located east of Val Vista Drive on the north side of Thomas Road. (1± acres). Design Review for a City of Mesa Water Utility Service Station. Brian Border, City of Mesa, Applicant; City of Mesa, Owner. Staff Planner: Chloe Durfee Daniel
Attachments: 1. Vicinity Map, 2. Elevations, 3. Renderings, 4. Site Plan, 5. Color and Material Board, 6. Landscape, 7. Project Narrative, 8. Alternative Landscape Plan Request, 9. Presentation
Date Action ByActionResultAction DetailsMeeting Details
No records to display.

Title

DRB23-00745 - "Central Mesa Reuse Pipeline" (District 1). Within the 3600 block of East Thomas Road (north side) and within the 3600 block of North Val Vista Drive (east side). Located east of Val Vista Drive on the north side of Thomas Road. (1± acres). Design Review for a City of Mesa Water Utility Service Station. Brian Border, City of Mesa, Applicant; City of Mesa, Owner.

 

Staff Planner: Chloe Durfee Daniel