Title:
|
“Cadence at Gateway Phase 2 School Site Infrastructure” (District 6) The 9600 to 9800 blocks of the East Toledo Avenue alignment (south side); and the 9800 block of the South Cadence Parkway alignment (west side). Located south and east of Ellsworth and Ray Roads within the Cadence at Gateway Community. 7 PCD Tracts (5.34± acres). PPGN-Ray, LLLP, developer; Raymond S. Munoz III, EPS Group, surveyor.
|