Sewer Pipe and Manhole Rehabilitation: Mesa Drive, Millet Avenue, Horne, and 6th Avenue (District 4)
The existing sanitary sewer lines covered by this project were built during the 1950’s and 1960’s. The age of these pipes greatly increases their risk of failure and emergency repairs. This method of construction can be completed while leaving the pipe in place and without excavation. Similarly, the sewer manholes will be cleaned, repaired, and coated in place. Only the concrete adjustment rings will be removed and replaced.
Staff recommends awarding the contract for this project to the lowest, responsible bidder, B and F Contracting, Inc, in the amount of $1,394,294.67, and authorize a change order allowance in the amount of $139,430 (10%), for a total amount of $1,533,724.67. Funding for this project is available from the 2014 Wastewater Bond Program.
|
Title
Sewer Pipe and Manhole Rehabilitation: Mesa Drive, Millet Avenue, Horne, and 6th Avenue (District 4)
The existing sanitary sewer lines covered by this project were built during the 1950’s and 1960’s. The age of these pipes greatly increases their risk of failure and emergency repairs. This method of construction can be completed while leaving the pipe in place and without excavation. Similarly, the sewer manholes will be cleaned, repaired, and coated in place. Only the concrete adjustment rings will be removed and replaced.
Staff recommends awarding the contract for this project to the lowest, responsible bidder, B and F Contracting, Inc, in the amount of $1,394,294.67, and authorize a change order allowance in the amount of $139,430 (10%), for a total amount of $1,533,724.67. Funding for this project is available from the 2014 Wastewater Bond Program.
|