File #: 15-0413   
Type: Contract Status: Agenda Ready
In control: City Council
On agenda: 4/20/2015
Title: Northwest Water Reclamation Plant Tertiary Filter Rehabilitation Project (District 1) This project is the second of a total of four Construction Manager at Risk projects planned at the Northwest Water Reclamation Plant (NWWRP) over the next two years. The NWWRP was originally constructed in 1990 and treats approximately 9 million gallons of wastewater per day. The plant is equipped with ten existing tertiary filters as part of the water reclamation process. The existing filters are beyond their useful life and refitting them with newer technology will require only three filters, in place of the ten that currently exist. The new filters will increase reliability and reduce operating costs. Recommend award of the construction phase services contract to Hunter Contracting with a Guaranteed Maximum Price of $3,841,144.67, plus an additional $384,114.47 (10% allowance for change orders), for a total award of $4,225,259.14. This project is funded by 2010 authorized Wastewater Bonds.
Strategic initiatives: Financial Stability, Quality of Life
Attachments: 1. Council Report, 2. Exhibit A - Project Map
Date Action ByActionResultAction DetailsMeeting Details
No records to display.
Title
Northwest Water Reclamation Plant Tertiary Filter Rehabilitation Project (District 1)
This project is the second of a total of four Construction Manager at Risk projects planned at the Northwest Water Reclamation Plant (NWWRP) over the next two years.  The NWWRP was originally constructed in 1990 and treats approximately 9 million gallons of wastewater per day. The plant is equipped with ten existing tertiary filters as part of the water reclamation process.  The existing filters are beyond their useful life and refitting them with newer technology will require only three filters, in place of the ten that currently exist.  The new filters will increase reliability and reduce operating costs.
Recommend award of the construction phase services contract to Hunter Contracting with a Guaranteed Maximum Price of $3,841,144.67, plus an additional $384,114.47 (10% allowance for change orders), for a total award of $4,225,259.14.  This project is funded by 2010 authorized Wastewater Bonds.